Production Resource Tool Integration with PM & PP

MAN Production Planning (PP), PLM Enterprise Asset Management (EAM)/Plant Maintenance (PM)

Introduction: Production Resource Tools (PRT): You can create PRT with the following types: In a manufacturing industry, we keep using various tools during productions and these tools require maintenance to keep them usable. Maintenance of such tools normally depends on their usage in the production operation. These tools can be considered as Production Resource Tools […]

Continue reading


Change Record in S4HANA – A New Look to ECR/ECO in S4HANA

PLM Quality Management (QM), MAN Production Planning (PP), PLM (Product Lifecycle Management)

As most of the folks are aware of the ECR and ECO functionality for the change Management for the BOM, Master recipe, Material Master etc. This functionality was phased out in S4/HANA, and Engineering Record was introduced. This too had some things missing like analyzing the impact etc., so from HANA 2020 SAP introduced Change […]

Continue reading


Baseline SAP PP Configuration Steps

MAN Production Planning (PP), SAP PP

Purpose: Purpose of this blogpost for understanding about baseline SAP PP Configuration steps of S4Hana, this blog consists of a comprehensive configuration screenshots of Production Planning, based on SAP S4Hana. Use: Baseline SAP PP configuration to execute manufacturing transactions for business run without any hassle. The configuration steps have mappings to corresponding menu path to […]

Continue reading


Crate Part Replenishment with POSC-Pick, Pack & Stage to PSA

SAP Extended Warehouse Management, EWM - Goods Movement, EWM - Interfaces, MAN Production Planning (PP), SAP S/4HANA

Objective: Determination of Crate Part Replenishment separate Item types in PMR document in EWM Determination of PSA bin from /SCWM/PSASTAGE table when HUs are closed from Packing Work center instead of hard coding PSA bins at WPT Synopsis: When manufacturing order is released having the BOM components, EWM system should be able to determine dynamically […]

Continue reading


Step by step introduction to set up and run a SAP PP Long Term Planning Scenario.

MAN Production Planning (PP), SAP HANA

SAP PP Long Term Planning (LTP) Overview Long-term planning (LTP) Is SAP PP procedure in which the simulative MRP run is used by production planners to compare various production scenarios concerning material requirement, vendor availability, and capacity planning for all materials listed in the Bill Of Materials (BOM). Using LTP, planners are able to establish […]

Continue reading