SAP HANA2 XS Advanced – a failover installation/configuration example with HANA System Replication

SAP HANA system replication, SAP HANA XS Advanced, SAP HANA

Let’s start with testing the DNS pre-requisite, both serge.xs2tests-wdf.sap.corp and *. serge.xs2tests-wdf.sap.corp must resolve to the failover web dispatcher: Install the Failover SAP Web Dispatcher guided by SAP Note 908097, my example uses version 7.49 patch 214. Make sure you can login to the SAP Web Dispatcher Administration URL. Depending on your end-users the SAP […]

Continue reading


Purchase Requisitions from Project Systems Material Components: BOM Explosion

PLM Project System (PS), SAP ERP

Introduction Purchase requisitions generated by material components assigned to network activities in PS carries a big limitation in a certain condition. If a requisition belongs to a material that is subcontracted (i.e. special procurement type 30) and has a Bill of Material (BOM) then this BOM is not exploded at the time of purchase requisition […]

Continue reading


Predictive Accounting in SAP S/4HANA 1809: A foundation for Intelligent forward-looking enterprise

SAP S/4HANA Finance, SAP S/4HANA

The next step of continuous accounting is predictive accounting, and it makes sense to see through the future to plan the business operations and make strategies. E.g. how much revenue organization will make based on incoming sales order data even if no goods receipt or invoice is booked. SAP S/4HANA 1809 has introduced predictive accounting […]

Continue reading


S/4HANA 1809 FPS00: Installation Procedure – II

SAP S/4HANA, SAP HANA, SAP S/4HANA 1809

Below are the links to my previous blog which describes installation preparation and procedure to install S/4HANA 1809 server. Link to Part 1: S/4HANA 1809 FPS00: Installation Preparation Link to Part 2: S/4HANA 1809 FPS00: Installation Procedure This blog highlight details on applying add-on like SAP Fiori Front-End Server 5.0, SAP Fiori for S/4HANA etc […]

Continue reading